TENERGY is concentrating on wind energy for the following:
- Distributed Generation sites in the 1MW to 5MW range feeding into the local distribution grid.
- Industrial sites in the 5kw to 250kw for businesses or farms.
- Medium size wind farms in the range 10MW to 50MW.
Current project list and status is as follows:
GREENHILLS
- Small DG site with potential for 1.5MW to 3MW.
- Mast (Trust Tower 40m) installed 2nd March 2007. Two years of data confirmed Class II / III site.
HURLEYVILLE WIND FARM AEP modelling completed and site potential being confirmed by surveys. Capacity expected to be between 80MW to 150MW depending on final investigations and ultimate area of land to be included. Currently 1000Ha is under contract and investors are sought for the initial investigation stage which is hoped to start in late 2010. See the site brochure here >>>>
Note that ONLY eligible investors are being sought to underwrite the investigation programme and that this investment opportunity is not a "public" offer of securities. Genuine investors will need to confirm their status as "eligible" as defined under the Securities Act before any commitment is made by Tenergy to enter into an agreement.
Note that the SITE BROCHURE must be read in conjunction with the Investment Opportunity document which is only available from Tenergy by request. The Investment Opportunity document outlines the key features of the proposal.
WHAT ABOUT YOU?
Is your location suitable for wind energy or are you looking for a wind turbine for your business or farm? Contact Geoff Eaton at TENERGY